Project Details
Location: Fort McMurray, AB
Time Frame: October 2018 – June 2019
Project Value: $2,100,000
Contract Type: Lump Sum
Services Rendered: Environmental & Demolition
Project Summary
Morgan provided hazardous materials abatement of the former camp site including an extensive asbestos abatement of the camp kitchen area. Through this technically challenging project Morgan built trust with the owner leading to the second phase of work which included demolition of the abated kitchen and eating area as well as several wings of the former camp. Special care was taken to size the demolished material and separate waste types to lessen the amount of material entering the landfill. Another challenge was that all materials had to be transported through the active mine site. Morgan with its many years of experience working in active mine sites was able to quickly provide trained and experienced drivers and trucks suitable for the task.


Project Scope
Safely removed, packaged, transported, and disposed of all hazardous materials found in buildings, such as asbestos floor tiles, PCB light ballasts, and mercury thermostats
Cleared out and demolished buildings along with their associated infrastructure, including the removal of piling
Processed and transported nearly 4,000 tons of various materials, including building debris, concrete, and metals
Loaded and transported over 1,000 loads of demolition debris to an on-site landfill
Projects
Leaders in environmental and demolition services
Our proven track record of success in environment and demolition is what separates Morgan from the rest of the market. Take a look at some of our recent milestone projects.

Morinville Retail Fuel Outlet Decommissioning
Read More
Surmont SAGD Pilot Plant Demolition
Read More
Firebag Camp Demolition
Read More
Watson Island “A-Mill” Demolition
Demolition of remaining structures at the former pulp mill site including two digester towers that were 280 feet tall and required significant engineering and pre-planning to topple and demolish. Morgan also managed waste caustic removal and chemical neutralization of residual waste as a cost effective alternative to packaging and offsite disposal.
Read More

Seniors Lodge Facility Abatement and Demolition
Read More

Public Works Yard Remediation
Read More

Acheson Remedial Excavation
Read More

Riverfront Park Remediation
Read More

Oak Bay Plaza Soil Remediation
Read More

Medicine Hat Retail Fuel Outlet Decommissioning
Read More